Bursley Elementary School
 
 
Project Description
RETROFIT:
Adhered
1195 Port Sheldon St. Jenison, MI
Owner:
Website

Architect:
General Contractor:
Website

At 24,943 SF: adhere 115 mil Fleeseback EPDM
direct to existing EPDM. (Wood deck)
At 15,228 SF: remove existing roofing to BUR,
install 1.5" and 1/8" tapered Iso then adhere 60 mil EPDM. (Metal deck)
At 6,219 SF: remove roof to deck,
install two layers 2" Iso then adhere 60 mil EPDM. (Metal deck)
At 1,860 SF: remove EPDM install 1/8" tapered Iso
then adhere 60 mil EPDM. (Wood deck)
At 100 SF 3 canopies: install 1.5" Iso
then adhere 60 mil EPDM. (Confirm wood deck)
Any existing wet insulation or BUR
must be removed/replaced prior to new roofing.