
Creekside Middle School
179 W. Roosevelt Ave., Zeeland, MI

Architect:![]()
|
|
Owner:![]()
|
|---|

|
ROOF SYSTEM 13,631 SF: Remove existing EPDM, 1/2" wood fiber and 2.5" expanded polystrene insulation to deck. Lay two layers 1.5" ISO & 1/8" sloped tapered ISO. Install Carlisle White 60 mil TPO system.
320 LF of Gravel Stop to be Pre-manufactured.
Replace 6 Skylights with new (including new curbs). |
|---|

 

