

Duncan Lake Middle School
2011 Reroofing Project
9757 Duncan Lake Road, Caledonia, MI

Owner:
Website

Roof Consultant:
Website

Project Description RETROFIT: 54,270 Square Feet
Multiple roof areas: F, G, H, J, K, L & M
Tear-off existing roofing system to deck at all areas.
At structural sloped decks install two layers 1.5" ISO
At flat deck K install 2 layers 1.5" ISO and 1/8" slope tapered ISO System
All insulation to be adhesively attached
Decks require adhesive primer prior to insulation attachment.
Install Fully Adhered 60 mil EPDM
Furnish/install 24 GA prefinished steel GS Match existing color.
ROOF SYSTEM
 
60 Mil EPDM
ADHERED

