

Jenison Senior High School Reroof
2410 Bauer Road, Jenison MI
 
 
 
Project Description
REROOF: 258,660 SF
EPDMOwner:

Architect:
General Contractor:
Website



241,575 SF adhere 115 Mil Fleeceback EPDM direct to existing EPDM
24,725 SF (Main Gym) - remove 2001 EPDM, adhered EPDM,
Fasteners, 1/2" woodfiber, and EPS leaving the BUR.
Install new 1/16" slope, 1" minimum tapered ISO and adhere 60 mil EPDM.
Wet insulation below existing EPDM to be replaced prior to Fleeceback installation.
New Gravel Stops - 24GA prefinished steel in a STANDARD color
ROOF SYSTEMS
 

Membrane

