BEFORE FIRE

Before Fire on 2-13-07

NEW FRONT ELEVATION

Proposed New Front Elevation

Lebowski Center
122 East Main St, Owosso MI

Owner:

OWNER LOGO
Website

Architect:


ARCHITECT
Website

Construction Manager:


CONSTRUCTION MANAGER
Website

Project Description

ROOFING: 7,460 Square Feet

Adhered vapor barrier (Firestone MB SA)
on structurally sloped concrete deck, Both Levels

2 layers 4.0" ISO, tapered ISO saddle at corner of upper roof,
1/4" DensDeck coverboard

Mechanically Fasten 50 mil Duro-Last CPA sheets.

Furnish/install (2) Bilco ACDSSH66144 Acoustic Rated
Smoke Hatches w/ fusible link, release cables, misc hardware.

SHEET METAL

Furnish/install Copings, Large Sill & Counterflashings

ROOF SYSTEM
 
Duro-Last Logo

DuroLastWebsite