NEW BUFFALO PIC

New Buffalo Middle/High School
Aditions & Renovations
1112 E. Clay St. New Buffalo, Michigan

Owner:

NBAS LOGO
New Buffalo Area Schools

Website

Architect:


ARCHITECT
Website

Construction Manager:


CONSTRUCTION MANAGER
Website

Project Description

NEW CONSTRUCTION
At membrane roof areas

NEW CONSTRUCTION and PARTIAL REROOF
at shingled roof areas

At 10,824 SF on structural sloped acoustic deck
install acoustic deck batt filler, substrate board, vapor barrier, 2" ISO base layer
and Mechanically Fasten to deck then Adhesively install 2nd layer 2" ISO
tapered ISO saddles and 1/4" DensDeck coverboard

At 1,452 SF on structural sloped std. metal deck
install 2" ISO base layer and Mechanically Fasten to deck
then Adhesively install 2nd layer 2" ISO
tapered ISO saddles and 1/4" DensDeck coverboard

Fully Adhere Firestone 60-mil EPDM

Furnish and install the nailbase insulation
under the areas of new shingled construction and
area where structural overbuilt occurs at existing shingles

Copings & counterflashings at membrane roofing
fascias, gutters & (2) downspouts at shingled areas
Copings to be Premanufactured in .050 aluminum

ALL other items to be Shop Formed in .050 aluminum in a STANDARD color
Furnish & Install Bellows Type Expansion Joint

ROOF SYSTEMS
 
Firestone Logo

Fully Adhered
EPDM

Firestone Website

LOCATION MAP

Other GLS Project Profiles