New Buffalo Middle/High School
Project Description
NEW CONSTRUCTION
NEW CONSTRUCTION and PARTIAL REROOF
Fully Adhered
Aditions & Renovations
1112 E. Clay St. New Buffalo, Michigan
Owner:
New Buffalo Area Schools
Website
Architect:
Website
Construction Manager:
Website

At membrane roof areas
at shingled roof areas
At 10,824 SF on structural sloped acoustic deck
install acoustic deck batt filler, substrate board, vapor barrier, 2" ISO base layer
and Mechanically Fasten to deck then Adhesively install 2nd layer 2" ISO
tapered ISO saddles and 1/4" DensDeck coverboard
At 1,452 SF on structural sloped std. metal deck
install 2" ISO base layer and Mechanically Fasten to deck
then Adhesively
install 2nd layer 2" ISO
tapered ISO saddles and 1/4" DensDeck coverboard
Fully Adhere Firestone 60-mil EPDM
Furnish and install the nailbase insulation
under the areas of new shingled construction and
area where structural
overbuilt occurs at existing shingles
Copings & counterflashings at membrane roofing
fascias, gutters & (2) downspouts at shingled areas
Copings to be
Premanufactured in .050 aluminum
ALL other items to be Shop Formed in .050 aluminum in a STANDARD color
Furnish & Install Bellows Type Expansion Joint
ROOF SYSTEMS
 

EPDM


![]()