ELEVATION

ROOF PLAN

Old Town Parking Deck
127 E. Eighth St. Traverse City, MI

Owner:


CITY OF TRAVERSE CITY
Website

Architect:

ARCHITECT
Website

General Contractor:

GENERAL CONTRACTOR
Website

Firestone Logo
ROOF SYSTEM
 
NEW CONSTRUCTION: 10,530 total SF.

Two Stair Towers and Ramp Roof.
Two Stair Towers total 1,947 SF
with 1,661 SF of Xero Flor & Pavers.
and 286 SF at the two Elevator Penthouses
Ramp Roof is 8,580 SF on structurally sloped concrete deck.
Ramp Roof install 1/2" IsoGard
Xero Flor areas: 1.0" min. 1/4" sloped ISO & 1/2" IsoGard cover board
ALL layers Full Coverage adhesive attachment.
Elevator Penthouses install 1.0" min. 1/4" sloped ISO
(No 1/2" IsoGard) Full Coverage adhesive attachment.

INSTALL 60 mil NR black fully adhered EPDM.

FURNISH & INSTALL: the Xero Flor and Pavers,
drip irrigation system and scuppers,
2 Bilco NB-20 roof hatches,
2 Greenheck WRH relief air louvers with curbs.