

Rosewood Elementary School
 
 
Project Description
RETROFIT:
Adhered
2370 Tyler St. Jenison, MI
Owner:
Website

Architect:
General Contractor:
Website

At 41, 096 SF adhere 115 mil Fleeceback EPDM
direct to existing EPDM. (Gyp deck)
At large additions 8,004 SF remove existing roofing
Install 1.5" Iso and 1/8" tapered Iso then adhere 60 mil EPDM. (Metal deck)
At 4,472 SF remove Mod Bit, install 2" Iso
Adhere 60 mil EPDM. (Metal deck)
At 76 SF install 1/2" HD Iso then adhere 60 mil EPDM. (Wood deck)
Any existing wet insulation or BUR
must be removed/replaced prior to new roofing.
At large additions remove existing to deck where EPS is direct on metal deck.
All new 24 GA prefinished steel gravel stops (Std Color)
ROOF SYSTEMS
 

60 Mil EPDM
115 mil Fleeceback

